Entities that are bridged with this bridge style will have what is effectively a Spanish Bridge at the start (this is the Gap), followed by the appropriate number of bridges with a fixed distance between them.
Fixed Number
Switch this option on if a fixed number of bridges should be added to all entities regardless of their length. Enter the required number.
Maximum length with no bridges
Enter the maximum length an entity can be without having bridges added to it.
Start gap length
Enter the required gap length as described above.
Minimum End Land Length
Enter the minimum land length allowed at the end of the entity.
Tie Bridges
These are generally smaller bridges that may be added to shorter entities. Select this option if they are to be used.
Width
Enter the required width of a tie bridge.
Maximum Length
Enter the maximum length that an entity can be before it has to have a standard bridge rather than a tie bridge.
Standard Bridge
Width
Enter the required width of a standard bridge.
Separation
Enter the required distance between successive bridges.
Intersections
Choose the required radio button to define what should happen when a bridge position coincides with the intersection between the bridged entity and another entity.
- Allow bridges at intersections
- Move bridges at intersections - Enter the required distance to move the bridge
- Delete bridges at intersections
Bridge Style - Specify start gap length